The Langshan Bajiao Stronghold Cableway will start operation on May 19

The construction of the Bajiao Stronghold Cableway has been successfully completed and it will officially start operation on May 19th. 

Compared with the old cableway, the new Bajiao Stronghold Cableway has achieved an all-round upgrade. The capacity of the cabin has significantly increased, from 2 people in the past to 8 people, which greatly improves the transportation efficiency.

The entire length of the cableway is 1,200 meters. Along the route, 9 supports are ingeniously set up, and it is equipped with 55 cabins, including 4 unique glass-bottomed cabins, providing tourists with a unique viewing perspective. The height difference of 353.5 meters not only brings a visual shock but also adds more fun and challenge to the journey.

Designed to carry 1,500 people per hour and with a daily transport capacity of up to 12,800 people, it is more than six times the transport capacity of the cableway before the renovation. This will greatly enhance the tourism reception capacity of the Langshan Scenic Area, effectively alleviate the pressure of tourist flow, and enable more tourists to enjoy a pleasant visit to Langshan with ease.

Leave a comment